The embroidery pricing formula — real math, layer by layer
A reproducible planning model, not a verified market-price survey. Presets are modeling assumptions unless supporting evidence is explicitly identified.
TL;DR — the formula
production = thread + stabilizer + needle wear + depreciation + labor + blank garment
cost per unit = production / (1 - reject rate) + (digitizing + batch setup) / current quantity
suggested price = cost per unit × markup multiplier
Use unrounded arithmetic until the final display. Fees, overhead and other unentered costs remain excluded.
Input evidence and editable controls
Updated: November 18, 2026. Unsupported survey and manufacturer attributions have been withdrawn. No shop-floor trial or current market survey validates these presets.
Edit stitch count, quantity, labor rate, digitizing, blanks, rejects, setup and markup in the calculator. Machine, thread and garment selectors use fixed presets; custom speed, thread price and stabilizer price cannot be entered. Use a separate worksheet when these assumptions do not fit your job.
| Input group | Basis today | Evidence needed for a firm quote |
|---|---|---|
| Thread, stabilizer, needles | Illustrative constants, not verified retail prices | Invoices, usable yield and measured consumption |
| Machine cost, speed, lifetime, salvage, hooping | Scenario assumptions, not validated specifications or production results | Exact-model documentation, invoice and timed sample |
| Labor, blanks, setup, rejects | User inputs; defaults are assumptions | Local costs, approved quotes and production records |
| Markup | User-selected planning multiplier | Complete cost coverage and a separately chosen profit objective |
The published model code documents implemented arithmetic and constants, not independent market evidence. Record actual inputs with the quote template.
Layer 1 — Thread cost
The model assumes 4.5 metres per 1,000 stitches, not a verified universal consumption rate. Actual usage depends on stitch geometry and design. Measure your consumption.
Illustrative USD price constants (not current retail quotes):
- Madeira Polyneon — $9 per 1,000 m
- Isacord — $8 per 1,000 m
- Generic polyester — $5 per 1,000 m
The formula: thread_cost = (stitch_count / 1000) × 4.5 / 1000 × cost_per_1000m. For an 8,000-stitch design with Madeira Polyneon: 8 × 4.5 / 1,000 × 9 = $0.32. That's the thread portion. Small. That's normal. Thread is rarely the driver of your unit cost — labor and machine time are.
Layer 2 — Stabilizer
The model assigns a per-piece stabilizer allowance. Actual layers, area, waste and material depend on the job; this allowance is not a backing recommendation.
Illustrative per-piece allowances:
- T-shirt, polo, apron, tote — $0.30–$0.40
- Cap, beanie — $0.25
- Jacket, hoodie — $0.55–$0.60
- Patch — $0.20
Calculate your actual allowance from usable sheet or roll yield. There is no custom stabilizer-price input; use a separate worksheet if the preset is unsuitable.
Layer 3 — Needle wear
These are assumed replacement-cost allowances per 100,000 stitches, not manufacturer-rated needle life. Follow appropriate machine and needle guidance for replacement.
- Brother PE800 single-needle — $0.50 per 100k stitches
- Brother 6-needle prosumer — $0.40 per 100k stitches
- Ricoma MT-1501 — $0.35 per 100k stitches
- Melco EMT16 Plus — $0.30 per 100k stitches
- Tajima Sai — $0.32 per 100k stitches
The formula: needle_wear = (stitch_count / 100000) × per_100k_rate. For 8,000 stitches on a Brother PE800: 0.08 × 0.50 = $0.04. Tiny per-job, but it's here because ignoring it hides a real cost and skews the answer for high-volume shops.
Layer 4 — Machine depreciation
Your machine is a capital cost recovered across its stitching life. We compute an hourly write-off from machine price and lifetime hours, then charge that rate against the job's runtime:
machine_depreciation = (runtime_minutes / 60) × (machine_cost × 0.9 / lifetime_hours)
The 0.9 factor assumes 10% salvage value, which is not guaranteed. This is planning allocation, not tax depreciation. Lifetime figures are assumed allocation periods, not rated service lives.
Assumed allocation lifetimes:
- Home single-needle (Brother PE800) — 3,000 hours
- Prosumer multi-needle — 6,000 hours
- Commercial single-head (Ricoma, Tajima) — 15,000–16,000 hours
- Commercial high-end (Melco EMT16 Plus) — 18,000 hours
Runtime is derived from stitch count divided by machine speed (stitches per minute), plus hooping time. See Layer 5.
Layer 5 — Labor
Labor is the biggest driver of unit cost for most jobs. Runtime multiplied by operator hourly rate, full stop. But runtime has to include hooping time — the setup portion of the job — because a five-second stitch-out on a hard-to-hoop cap still eats operator minutes.
runtime_minutes = (stitch_count / stitches_per_minute) + (hooping_minutes × hooping_multiplier)
Scenario speeds, not validated effective rates or verified manufacturer specifications:
- Brother PE800 — 650 spm
- Brother 6-needle — 1,000 spm
- Ricoma MT-1501 — 1,200 spm
- Melco EMT16 Plus — 1,500 spm
- Tajima Sai — 1,200 spm
Assumed hooping baseline is 2–3 minutes. These multipliers are scenarios, not measured handling times:
- T-shirt, polo, tote, apron — 1.0× (easy)
- Hoodie — 1.1×
- Jacket — 1.2×
- Cap / hat — 1.3× (cap frame is slower)
- Beanie — 1.4× (fiddly)
The $22/hour default is an illustrative USD input, not an industry average. Enter your actual labor cost. The model charges labor for full modeled runtime, without modeling concurrent jobs or unattended operation.
Layer 6 — Digitizing amortization
Digitizing and setup/sew-out are whole-batch costs, allocated across the current quantity. Hypothetical future reuse does not reduce this order's price floor.
digitizing_allocation = digitizing_cost / current_quantity; setup_allocation = batch_setup_cost / current_quantity.
For a 30-piece batch, $15 digitizing and $15 setup contribute $0.50 each per unit. Explicit zero is allowed for already-paid digitizing or genuinely absent setup; blank inputs are unknown and blocked.
Use a current quote for your actual design. The $15 default is an assumption, not a surveyed market rate.
Markup multiplier — the last step
Price = modeled cost × multiplier. Multipliers of 2×, 2.5× and 3× imply modeled margins of 50%, 60% and about 66.7% before excluded costs. These are arithmetic examples, not recommended industry rates.
A multiplier cannot guarantee rent, fees or profit are covered. A 50% markup on cost produces a 33.3% margin on price; markup and target margin are different.
Worked example — a left-chest polo logo, quantity 24
Design: 6,000 stitches. Garment: polo with $6.50 blank. Machine: Ricoma MT-1501. Thread: Madeira Polyneon. Operator: $22/hr. Current batch: 24. Digitizing: $20; setup: $15; rejects: 5%; markup: 2.5×. Illustrative inputs, not observed production or market prices.
- Thread: 6 × 4.5 / 1,000 × 9 = $0.24
- Stabilizer: $0.35
- Needle wear: 0.06 × 0.35 = $0.02
- Runtime: 6,000 / 1,200 + 2 × 1.0 = 7 min
- Machine dep: 7/60 × (10,500 × 0.9 / 15,000) = $0.07
- Labor: 7/60 × 22 = $2.57
- Blank garment: $6.50; expected production cost divides the unrounded production subtotal by 0.95.
- Digitizing/setup allocation: (20 + 15) / 24 = $1.46
- Cost per unit: $11.73
- Planning price using unrounded cost × 2.5: $29.31
Markup 2.5× gives 60% modeled margin before excluded payment fees and overhead; it is not a 250% target margin. Batch totals use unrounded unit arithmetic, so multiplying displayed two-decimal unit amounts may differ. Verify effective runtime and hoop/frame fit before quoting.
What we did not include
Bobbin thread, small parts, rent, electricity, payment fees, packaging, shipping, tax and administration are not separately modeled. Depreciation is a capital allocation, not evidence that consumables are covered. Add relevant costs to your own worksheet; do not assume they are negligible.
Rush fees, custom digitizing, and multi-location designs are add-ons you charge on top of the base cost. There are no dedicated toggles for them in the current interface; add them separately.